The sonde is run inside the drill pipe, adhering to the tracer, whilst it's remaining pumped. The loss place has actually been reached when radioactive Make contact with is lost. Height of fracture: width of fracture entrance = six: 1, the coincidence degree in the indoor and field drilling fluid lost control performance is higher, along wit